Our References
  • Sieo-
  • Mixing and Finished Product Preparation System 2020

    Scope: General process design and construction of the finished product dilution system.

  • Grupo SIEO is awarded a contract to design and build a tequila dilution and preparation system. The process includes dilution, storage, filtration, and shipment to bottlers. The entire process encompasses the design and construction of tanks, the dilution system, liquid filtration and polishing, and the dispatch of the finished product to the bottling lines.

    The designed and constructed processes are entirely automatic and interconnected with the tequila tanks and storage systems.